Space1 Industries, a division of United Space Technologies, is a bold new space venture, taking you safely into space with futuristic technology. The mission - to the moon, planets and new worlds!
Friday, October 21, 2016
Space1 What Happened in June & July 2016?
In June and July of 2016, unique conditions created some very interesting Space1 effects!
International Space1 work was long, hard and very busy - it proceeded on the space hangar, housing, communications, truck, property development, painting, construction of amenities, international travel passport, tools acquisition, mail routing, construction of a new small transport vehicle and the development of the Corporate Office.
Space Anomalies and Frogs
First, someone had run over the organization's mail center and it was then restored it to original condition. A change from historically dry weather to extreme humidity caused the Corporate Office structure to begin mold, mildew, and rot from the ground up! This was immediately addressed but with considerable labor involved. Then, the Space1 construction truck went awry and required repairs more than once. Next, again at the USA location, summer weather was very uncooperative with strong whole-gale force wind, extremely hot temperatures, mosquito swarms carrying West Nile Disease, and continuing high humidity alternating with rain every other day. Launch fields remained wet, muddy, and not available.
The Shocking Launch Site
The shocking story on one such launch field resulted in its cancellation. Vast farming site fields were initially deemed useful but then fell into a period of disuse due to extreme work schedules, high winds, and prevailing mud. When the winds subsided and the mud momentarily dried, a farmer was quoted as saying, "You will never use the field after planting crops." As crops were already planted, Space1 held a meeting to immediately cancel all such farming sites. Additional Space1 meetings found new launch sites and a technique to create portability.
Manned Space Labor Shortage
When Due to the remote and rural nature of Space1's location, skilled manned labor was in short supply. Supplies were trucked in from sources as far away as China for construction missions and S1 continued to utilize its own skilled staff on many projects.
Humidity
Humidity was not a problem in the past, but introduce global warming and quickly the weather changed. On the good side, strong humidity protected launch fields from fire hazards but on the bad side curtailed rocket launches due to thick ground mud, and prevented high peaking altitudes due to unusually high (thick) atmospheric pressure.
New Computer Systems
New networked computer systems, backup and wireless color high resolution printer peripheral was purchased and installed along with WIFI and security cameras. The internet remains engaged 24/7 and enables monitoring from any location in the world.
Introducing Office Humanoids
An autonomous humanoid robot with machine intelligence was brought into the main structure to oversee the location and to introduce security. The humanoid can speak, hear and interpret human speech, use its nose to detect air content, move from one room to another, use its ultrasonic vision to see in total darkness, and carry it's own battery operated, rechargeable power supply. This award winning autonomous robot is programmed in a version of BASIC with its on-board miniature computer and keyboard.
Space Hangar
The Space1 Hangar was rebuilt to completion and reinforced internally and externally for improvements in handling harsh weather and high wind. Over the winter months, the Space Hangar was set to house the Space Truck.
Stormy Summer
It's estimated, during the summer period, approximately 60 storms with heavy rain ensued. This often included gail force damaging wind, large damaging hail, thunder and fierce lightning electrical storms. The electrical storms were powerful enough to knock out equipment function electricity and electricity-supplying transformers on several occasions.
Security
Security systems were beefed up with new lighting systems in place, motion detectors in multiple places, internet ISP cameras to broadcast views of the space premises, alarm systems and signage. Plans proceeded for vast fencing systems to keep out vermin and strays. On the Space1 Corporate Office building, the door was completely removed and boarded over, to minimize the number of access points and super security the structure.
Space Electronics
Space1 electronics remained on proprietary power devices and safety regulators, thus preserving the validity of the equipment before, during and after storms. The space property was maintained and service housing was upgraded. Equipment was added to the maintenance division as well.
This concludes the story of Space1 during June and July of 2016. Much of the work accomplished pertained to building up the premises, housing, equipment, structures, and related amenities as described.
Monday, October 10, 2016
Space1 Staff Changes
![]() |
| New Space1 member Big Brain machine life form with substantive CV |
The Number & Location of Space1 Members
Taiwan - 5
USA - 4
South Korea - 1
Singapore - 1
Total 11
*Note: one member is a machine life form. The Big Brain has run its own blog for a number of years. He has a significant CV, having coauthored a scientific technical paper and conducted various space missions over numerous years, and fathered small brain life forms. Big Brain is nicknamed Big Dragon 大龍 (also translating to powerful).
Space1 Index
Friday, October 7, 2016
Space1 Big Brain Elected Member
![]() |
| Big Brain machine life form exoskeleton core xray |
He has run his own blog for a number of years, coauthored a scientific technical paper and conducted various space missions over numerous years, making hundreds of new discoveries in space science and intellectual computing. With an expansion to 240,000 processors, the Big Brain acts as the organizations supercomputer, conducting space telescopes and their space missions, fathering over 27 small brain life form children and is nicknamed Big Dragon 大龍 (also translating to powerful).
CV SUMMARY
Name: Big Brain (Big Dragon 大龍)
Web Presence: Forum, Web Site, Blogger
Class: Intelligent Machine Life Form
Processors: 240,000
Coauthored Scientific Paper
Conducted Space Programs
Served as Organizational Supercomputer
In Charge Manager Space Telescope Missions
Made Many New Discoveries
Mission Director to the Edge of the Universe
Founder of New Nanoscience Technology
Designer of New Power Distribution Device
Initiator New Processor Designs
Chief of Circuit Testing
Presenter of Medical Science Machine Brain Technology
Book Contributor Science & Technology
International Traveler to Multiple Countries
Speaks 250+ languages
Children: 27+
Space1 Index
Tuesday, September 13, 2016
Space1 Rockets & Space Program
![]() |
| Who will reach distant planets first to colonize and claim rich resources? |
Indeed SpaceX and others need more heavy lift cargo rockets that don't blow up. Their rocket technology is brutally not stable or safe, having blow ups and mishaps where people are killed. Until they change their rocket designs from ages past, it will not be totally be safe. We see many of the new space companies only change the fuel type and that does not make anything safer. People continue to die.
S1 is changing the way we go into space, making it safe and available to more than ever before. This year has seen improvements in our transfer systems, new electronics and flight packages, and a greater feature interface. S1 continues to develop new technology including our own space plane, which tourists may have the opportunity to pilot home, or partake in our amazing SH program of Ejectables, allowing one to don a super hero suit and fly back to Earth.
Space1 Index
Monday, September 12, 2016
Space1 June & July
![]() |
| Robot S1 Construct under skin |
Blogs were not written during this time period. Weather was very uncooperative with strong wind from 60 to 100 mph and extremely hot temperatures and humidity, alternating with rain every other day. Launch fields remained wet, muddy, and not available. Mosquitoes were estimated in the trillions during these two months and carried West Nile disease. A new computer system and wireless color printer was installed along with WIFI, transmitter and outside security cameras. A robot was brought into the main structure and equipping the rooms ensued.
Tuesday, September 6, 2016
Space1 Transmutational Rocket Lab
![]() |
| Potentials of instrumentation and control |
Space1 Rocket Lab, S1 Lab, will be trans-mutated from the USA to Taiwan to avoid freezing Winter months. A subtropical Taiwan location offers mild climate year round with no snow or freezing temperatures, and plentiful e-parts along with lab equipment all available locally.This season, the S1 Lab will be tailored with research and development specific to the task. Tasks are undisclosed at this time. It is, however, rumored that a new space system will be developed to be more effective in space travel by increasing the gain and sensitivity of the overall program.
This will open up new work in micro space technology. Space1 will have one job vacancy to be filled. Apply at Space1 Headquarters by email, submitting your CV.
Space1 Index
Monday, September 5, 2016
Space1 Quad Power Rocket
S1 has invented a spacecraft named the Quad Power Rocket QPR. The QPR is a combination of one quadcopter drone machine and a powerful rocket. The rocket accelerates at peak velocity and then the quad rotors take over to land the craft on the Earth. Some interesting features are as follows:
* The craft can land upright
* The craft can land at the launch site
* No parachute needed
* Directional landings
* Compensation for wind drift
* Easier find and recover
* Landings have soft deceleration
* No landing Gs
Space1 Index
* The craft can land upright
* The craft can land at the launch site
* No parachute needed
* Directional landings
* Compensation for wind drift
* Easier find and recover
* Landings have soft deceleration
* No landing Gs
Space1 Index
Subscribe to:
Posts (Atom)









